Fabrication Capabilities in Brentwood
Commercial Entrance Systems
Supply and fitting of robust commercial sector glazing which balance customer appeal with practicality, public safety and STS202 burglar resistance.
Toughened Safety Glass
Replacement and upgrade services utilizing architectural glazing and 10mm to 12mm toughened safety glass for superior impact resistance.
Aluminium Shopfronts
Fabrication and installation of highly durable, RAL powder-coated aluminium shopfronts designed for maximum street appeal and longevity.
Retail Facades
High-end commercial shopfront engineering utilizing ground floor framing suites to support heavy architectural glazing.
Engineering Solutions
Retailers and commercial properties in Brentwood face significant challenges with non-compliant manual doors that restrict disabled access.
- Powder Coating (RAL/British Standard)
- Architectural Glazing Standards
- Rapid Manufacturing Lead Times
- Bespoke Facade Engineering
Satisfied Clients
They ripped out our old timber frame and executed a flawless shopfront installation with automatic doors. The bespoke facade engineering has transformed our retail unit in Brentwood. Outstanding engineering.
Client Inquiries & FAQs
How long does a shopfront installation take?
Because we utilize in-house CAD design services and fabricate everything prior to arriving on site, the physical shopfront installation is often completed within 24 to 48 hours to minimize business disruption.
Are your aluminium shopfronts custom-made?
Yes. Every frame undergoes precise aluminium fabrication in our workshop to your exact dimensions, utilizing powder coating (RAL/British standard) to match your corporate branding.
