CALL ESTIMATOR
Aluminium Shopfronts and Commercial Glazing in Olympic Park

Shopfront Installation in Olympic Park

First impressions dictate footfall. We design and build premium aluminium shopfronts in Olympic Park. From CAD design services to final architectural glazing, we handle the entire project.

Engineering Solutions

Retailers and commercial properties in Olympic Park face significant challenges with outdated, poorly insulated facades.

  • Strict DDA Compliance
  • Architectural Glazing Standards
  • In-House Aluminium Fabrication
  • Powder Coating (RAL/British Standard)

Fabrication Capabilities in Olympic Park

Commercial Shopfronts

High-end commercial shopfront engineering utilizing ground floor framing suites to support heavy architectural glazing.

Shopfront Maintenance

Rapid mobile response for smashed windows, damaged hinges, and faulty automatic door sensors on all commercial shopfronts.

Toughened Safety Glass

Replacement and upgrade services utilizing architectural glazing and 10mm to 12mm toughened safety glass for superior impact resistance.

Automatic Doors

Supply and fitting of DDA-compliant automatic sliding and swing doors seamlessly integrated into your new aluminium shopfront.

Satisfied Clients

They ripped out our old timber frame and executed a flawless shopfront installation with automatic doors. The bespoke facade engineering has transformed our retail unit in Olympic Park. Flawless execution.

- Verified Commercial Client

Client Inquiries & FAQs

Do you handle emergency shopfront glass repairs?

Yes, we offer rapid response for smashed or compromised architectural glazing, ensuring your premises are secure and operational as quickly as possible.

How long does a shopfront installation take?

Because we utilize in-house CAD design services and fabricate everything prior to arriving on site, the physical shopfront installation is often completed within 24 to 48 hours to minimize business disruption.