Engineering Solutions
Retailers and commercial properties in Park Royal face significant challenges with fragile single-glazed windows vulnerable to vandalism.
- In-House CAD Design Services
- Fully Insured Installation Teams
- Powder Coating (RAL/British Standard)
- Strict Building Control Compliance
Fabrication Capabilities in Park Royal
Commercial Shopfronts
High-end commercial shopfront engineering utilizing ground floor framing suites to support heavy architectural glazing.
Shopfront Installation
Complete retail and commercial shopfront installations designed to maximize structural integrity, security, and aesthetic value.
Curtain Walling Integration
The design flexibility and strength of aluminium combined with high-performance curtain walling products to extend your shopfront facade.
Bespoke Aluminium Shopfronts
Fabrication and installation of highly durable, powder coating (RAL/British standard) aluminium shopfronts designed for maximum street appeal and longevity.
Satisfied Clients
They ripped out our old timber frame and executed a flawless shopfront installation with automatic doors. The bespoke facade engineering has transformed our retail unit in Park Royal. Outstanding engineering.
Client Inquiries & FAQs
How long does a shopfront installation take?
Because we utilize in-house CAD design services and fabricate everything prior to arriving on site, the physical shopfront installation is often completed within 24 to 48 hours to minimize business disruption.
What security ratings do your shopfronts carry?
Our high-security commercial shopfronts and doors are built to stringent standards, frequently incorporating STS202 burglar resistance for maximum retail asset protection.
