Fabrication Capabilities in Royal Docks
Automated Entrance Systems
Supply and fitting of DDA-compliant automatic sliding and swing doors seamlessly integrated into your new aluminium shopfront.
Aluminium Shopfronts
Fabrication and installation of highly durable, powder coating (RAL/British standard) aluminium shopfronts designed for maximum street appeal and longevity.
Toughened Safety Glass
Replacement and upgrade services utilizing architectural glazing and 10mm to 12mm toughened safety glass for superior impact resistance.
Retail Facades
High-end commercial shopfront engineering utilizing ground floor framing suites to support heavy architectural glazing.
Engineering Solutions
Retailers and commercial properties in Royal Docks face significant challenges with non-compliant manual doors that restrict disabled access.
- Ground Floor Framing Suites
- STS202 Burglar Resistance Certification
- Fully Insured Installation Teams
- Architectural Glazing Standards
Satisfied Clients
They ripped out our old timber frame and executed a flawless shopfront installation with automatic doors. The bespoke facade engineering has transformed our retail unit in Royal Docks. Highly recommended.
Client Inquiries & FAQs
Do you handle emergency shopfront glass repairs?
Yes, we offer rapid response for smashed or compromised architectural glazing, ensuring your premises are secure and operational as quickly as possible.
How long does a shopfront installation take?
Because we utilize in-house CAD design services and fabricate everything prior to arriving on site, the physical shopfront installation is often completed within 24 to 48 hours to minimize business disruption.
