Fabrication Capabilities in Tring
Toughened Safety Glass
Replacement and upgrade services utilizing architectural glazing and 10mm to 12mm toughened safety glass for superior impact resistance.
Curtain Walling Integration
The design flexibility and strength of aluminium combined with high-performance curtain walling products to extend your shopfront facade.
Shopfront Replacement
Complete retail and commercial shopfront installations designed to maximize structural integrity, security, and aesthetic value.
Commercial Entrance Systems
Supply and fitting of robust commercial sector glazing which balance customer appeal with practicality, public safety and STS202 burglar resistance.
Engineering Solutions
Retailers and commercial properties in Tring face significant challenges with non-compliant manual doors that restrict disabled access.
- Strict Building Control Compliance
- Ground Floor Framing Suites
- Bespoke Aluminium Fabrication
- Powder Coating (RAL/British Standard)
Satisfied Clients
They ripped out our old timber frame and executed a flawless shopfront installation with automatic doors. The bespoke facade engineering has transformed our retail unit in Tring. Flawless execution.
Client Inquiries & FAQs
How long does a shopfront installation take?
Because we utilize in-house CAD design services and fabricate everything prior to arriving on site, the physical shopfront installation is often completed within 24 to 48 hours to minimize business disruption.
What security ratings do your shopfronts carry?
Our high-security commercial shopfronts and doors are built to stringent standards, frequently incorporating STS202 burglar resistance for maximum retail asset protection.
